The unbearable traffic congestion in the city by 2019 instead of 2024 in the "MRT Line-

6" (Metro) to complete the construction of the first phase of work. Today, according to the annual report submitted to the Cabinet.
Metro to build the first phase would be to Motijheel from Uttara report, aims to project before the end of the period is 5 years.