Although three days have passed but it can not be repaired cracks beneath pulled the gas pipe.Tuesday (10 March) at the earth from the shore of the river trying to find the hose bursting Titas Gas office workers. But the writing of the report, it was not possible to find out the hose.So on one side of the boat, all of the traffic stop. Several different types of sand trawler boats are trapped.
Meanwhile, over at the gas shortages in several areas fulbaria kalinagarasaha.
Sunday (8 March) in the afternoon on the Dhaka-Aricha Highway Bridge Bank Town trawler gharsane pipe is made of the cracks.
Because it is not yet possible to repair cracks serious accidents can happen at any time, the locals feared.
Cracks in the pipe to avoid accidents at the site of the relevant factors in Savar, Titas Gas officials eksapartake team news. On hearing the news of the Expert Team on Monday visited Ghazipur off the gas, but was unable to fix the pipes.
Tuesday Savar police visited the spot.
Titas Gas office manager at the scene said the engineer Subject isalam Bangladesh, decreased water pipes gharsane trawlers fishing in the form of bubbles of gas coming out of the cracks in the pipe. Points around the eyes has been warned to avoid serious accidents.



